Case study

Design time cut by 98%.

Client
Anglo
Sector
Apparel and headwear
System
Design automation
Outcome
10h → 10min per design

The friction

Ten hours of manual pixel work per design. Every new colourway meant a designer rebuilding the artwork by hand, so the team could only explore a fraction of the designs it wanted to.

The system

A custom design-automation system that applies complete colourways automatically, letting the team explore far more designs at no additional cost.

Explore design and production automation

The result

Ten minutes per design, down from ten hours. The same team now ships far more designs without adding headcount.

10 minper design, down from 10 hours
Next case: Estia Tuition